Overview of Islamabad and Rawalpindi Metro Bus : Metro Bus Islamabad Route

AspectDetails
Operation AreaIslamabad to Pindi
Inauguration DateJune 4, 2015
Key features– Two-lane limited access corridor with passing lane at stations– Elevated portion from Saddar to IJP (8.3 km)– 24 stations (14 at-grade, 10 elevated)– Platform sliding doors– Elevators and escalators– Automated fare collection system with off-board ticketing– Bus scheduling system– Vehicle location system– Passenger information system– 68 articulated air-conditioned buses
RidershipHighest ridership of 151,000 per day
Total Passengers Transported76 million passengers
Helpline NumbersRawalpindi Metrobus:(051) 111-222-627
Operating AuthorityPunjab Mass transit Authority 

Ticketing and Timetables

Islamabad Metro Buses operate from 06:15 to 22:00. The system uses an Intelligent Transport System (IST) and an e-ticketing system.Metro Bus Islamabad Route

The Punjab Metro Bus Authority (PMBA) operates the system, while the Punjab IT Board operates the automated system. Since both are part of the same transport system, the timetables of Rawalpindi Metro Buses are identical.

Metro Bus Islamabad Route

In addition, there are ticket counters, escalators, toilets, screens on the platforms, turnstiles for automatic ticket collection and other amenities to ensure a safe and comfortable journey for passengers.

A central ITS control room monitors the operation of the entire BRT system. Metro Bus Islamabad Route

How do I buy a Metro Bus Ticket?

Passengers using public transport in Islamabad need a ticket, token or Metrobus card. These can be purchased or topped up at the ticket counters at various Metrobus stations or at Ticket Machines (TVMs).

To purchase a token at the TVM, select the desired number of tokens, enter the desired amount (PKR 30 per token), and then collect the receipt and token. A Metrobus card, on the other hand, costs around PKR 130. Passengers can return the card for a refund, but only if it is in perfect condition.

 Otherwise, the ticket is deducted. Additionally, the remaining balance is displayed when you hold the card at the boarding and alighting points.

Buy a ticket or ticket

Metrobus cards and tokens serve the same purpose. However, the card is more suitable for people who travel to school, university or work every day, as they do not have to queue for a token.

A token, on the other hand, is only valid for one journey and is valid for around an hour. After that, it is no longer accepted at the gates.Metro Bus Islamabad Route

If the token expires and the person has not yet left the gate, a fee of 50 rupees is charged, which must be paid in cash on the spot. The same procedure applies if the token is lost.

Facts about the Islamabad Metro bus service

Line 1, which runs from the Pakistan Secretariat to Saddar, is 23 km long.

Line 1 has 24 stations, the construction of which cost about 44.

The Metro rapid transit system was the first in the country to use e-ticketing. A ticket currently costs 30 rupees for Line 1 and about 50 rupees for Line 2.

The project currently comprises 68 buses, of which 60 are in active service and eight are reserve buses.

The metro was previously operated by the Turkish company M/S Platform Turizm.

The Punjab Mass Transit Authority (PMA) sets the timetable and fares for the metrobus.

The Islamabad Metrobus phone number is (051) 111-222-627.

Airport Metrobus Line Update

The construction of the Peshawar Motor Line to Islamabad International Airport is currently underway. The nine bus stops include G-10, NUST, NHA, M1-M2 Junction, Grand Trunk Road, G-1, Badana Kalan and the airport.

The metrobus project includes 12 bridges, 26 culverts and 11 underpasses. 

The government assumed that the project would be completed, estimating that commuters who pay PKR 500 to PKR 1,200 for taxis would benefit the most.

The project was initially launched in January 2017 and was to be implemented in four phases:

The first phase involved the completion of the stretch from Kashmir Highway Metro Station to the National University of Science and Technology (NUST).

The second phase extended from NUST to Grand Trunk (GT) Road.

The third phase extended from GT Road to the junction.

The final phase included the completion of the metros and bridges.

However, the project had not yet begun as of March 2022.

There is a huge demand for properties near the new Islamabad International Airport, and people are eagerly waiting for the stretch from Kashmir Highway to Islamabad International Airport to be completed so that they can use it.

Work continues : Metro Bus Islamabad Route

The Metrobus line was inaugurated today, as the airport line of the capital’s Metrobus system is extended from Kashmir Highway Metro Station to Islamabad International Airport as originally planned.

This will significantly improve the airport’s connectivity to many important areas of the city and ease daily commute.

A shuttle bus will connect Kashmir Highway Metro Station, the starting point of the route, to various parts of the capital.

The National Highway Authority (NHA) completed work on a 27-kilometer stretch of the new Metrobus line last year at a cost of PKR 16 billion.

The procurement of 30 new buses for the Peshawar Mor–Islamabad Airport BRT line is underway. 

The Capital Mass Transit Authority (CMTA) will also be established to oversee the operation of the Metrobus line in Islamabad. The Capital Development Authority (CDA) will directly manage and control the CMTA once it is established.

Expansion of the Metrobus Network : Metro Bus Islamabad Route

Like the Lahore Metrobus stations, the Islamabad and Rawalpindi Metrobus systems have been expanded in the past, and further expansions are planned. In 2018, two more stations were added to extend the route from Saddar in Rawalpindi to the 

Pakistan Secretariat in Islamabad.

The system initially consisted of 24 stations. The two new stations were Faizabad and Peshawar Mor, and the expansion added 5.6 kilometers to the route.

 In addition, there are plans to expand the Metrobus network to the outskirts of Islamabad and Rawalpindi. 

Metro Bus Islamabad Route

In addition to connecting more communities to the system, the planned expansions will increase the number of stations along the existing route.

 The expansions are intended to improve connectivity and accessibility, as well as facilitate mobility between the different areas of the twin cities.

Although the timetable and details of the planned expansions have not yet been announced, they are expected to come into effect soon. The residents of the twin cities will benefit greatly from the expansion, which will help strengthen the reputation of the Metrobus system as a convenient and reliable means of transportation.

F.A.Q

Here are some frequently asked questions about the Metrobus lines in Rawalpindi and Islamabad ?

When do the Metrobus lines in Rawalpindi and Islamabad operate?

The Metrobus lines in Rawalpindi and Islamabad operate daily from 06:00 to 23:00.

Click for more :

By Hamad

Leave a Reply

Your email address will not be published. Required fields are marked *